You may also like
More from Metcal
Recently viewed
**All Workbenches are final Sale! No returns or cancellations**
**All Workbenches are final Sale! No returns or cancellations**
Proud to announce we are ISO 9001:2015 | 13485:2016 Certified
Proud to announce we are ISO 9001:2015 | 13485:2016 Certified
If you have any Questions? Call us at (651) 600-3838
If you have any Questions? Call us at (651) 600-3838
*2 Week Lead Time
The Metcal BVX-250 is a compact, high-performance portable fume extractor designed for two-station use. Featuring 99.97% efficiency HEPA 13 filtration, twice the suction power of previous BVX models, and a quick 30-second filter change system, the BVX-250 delivers quiet, effective fume, smoke, dust, and vapor removal at the benchtop. Compatible with previous BVX and Omniflex arms and hoses (sold separately). Communicates directly with Metcal CV and GT Series soldering systems.
| Specification | Detail |
|---|---|
| Max. Airflow (free blowing) | 297 m³/h (175 cfm) |
| Flow Rate | 2 × 75 m³/h (45 cfm per station) |
| Static Pressure | 1,743 Pa (7" WC) |
| Noise Level | <55 dBA (medium setting) |
| Voltage | 100–240 VAC, 1 phase |
| Frequency | 50/60 Hz |
| Power | 150 W |
| Dimensions (W × D × H) | 268 × 400 × 320 mm (10.5" × 16" × 13") |
| Weight | 12 lbs / 5.5 kg |
| Safety Compliance | UL, CSA, UKCA, KC, PSE, NOM, CE (ISO-14644), TUV |
| SKU | BVX-250 |
How many soldering stations can the BVX-250 support?
The BVX-250 supports two simultaneous stations, with a flow rate of 75 m³/h (45 cfm) per port.
Is the BVX-250 compatible with my existing BVX arms and hoses?
Yes — the BVX-250 is backward-compatible with previous BVX and Omniflex arms and hoses. Arms and hoses are sold separately.
How long does a filter change take?
Filter changes take approximately 30 seconds with no tools required. The LED status ring indicates green (active), blue (idle), or amber/red (filter change needed or incorrect installation).
Does the BVX-250 work with Metcal soldering systems?
Yes — the BVX-250 communicates directly with Metcal CV and GT Series soldering systems for integrated operation.
What is the lead time for the BVX-250?
The BVX-250 has an approximate 2-week lead time. Contact MTE Solutions for current availability and pricing on volume orders.
Join our mailing list to receive specials and up to date product news and releases

TO ADD MULTIPLE ITEMS TO YOUR QUOTE, PLEASE FILL QTY FIELD THEN CLICK ON "ADD TO QUOTE"