ACL Staticide DMP2460DG Dark Gray 24" x 60" Dualmat Kit
ACL Staticide DMP2460DG Dark Gray 24" x 60" Dualmat Kit
This MTE Solutions-assembled workstation bundle pairs the ACL Staticide DMP2460DG dark-gray DualMat, sized 24" x 60", with the accessory SKUs listed below. ACL manufactures the DualMat; MTE assembles this combination for shoppers seeking a mat, grounding accessories, and workstation supplies together. Check that each component fits your ESD-control procedure.
Best Uses / Applications
- Electronics assembly benches needing a 24" x 60" static-control mat.
- Repair and inspection workstations with a longer work surface than a 24" x 48" mat.
- Setting up a new ESD work area with a mat, ground cord, wrist strap combo, cleaner, lotion, and wipe sample.
MTE Bundle Contents
- DMP2460DG: ACL dark-gray DualMat, 24" x 60" x 0.08".
- 8090: ground cord.
- 6001S: mat cleaner.
- 7001S: hand lotion.
- 8150: wrist strap and cord combo.
- LF50S: wipe sample.
ACL DualMat Specifications
| Mat color and size | Dark gray; 24" x 60" |
|---|---|
| Mat thickness | 0.08" |
| Construction | Static-dissipative top and conductive bottom layers |
| Finish | Embossed |
| Mat connections | Two 10 mm female snaps on pre-cut mats, per ACL DualMat information |
| Top layer | ACL lists 10^6–10^8 ohms |
| Bottom layer | ACL lists less than 5 x 10^5 ohms |
These describe the mat material, not certification of an installed workstation. Install and test the complete work surface and personnel grounding under your ESD program.
Frequently Asked Questions
Is this an ACL factory kit?
No. It is assembled by MTE Solutions using an ACL DualMat and the listed accessories.
What size and color is the mat?
The DMP2460DG mat is dark gray and measures 24" x 60" x 0.08".
Does it include a ground cord?
Yes, the listed bundle includes the 8090 ground cord.
Is personnel grounding included?
The 8150 wrist strap and cord combo is listed. Follow your facility's grounding and testing procedure.
Does the bundle alone make a compliant ESD workstation?
No. Installation and testing of the completed station are still required.
